STATEWIDE TRAFFIC SIGNAL LED UPGRADE

  • Posted by: admin
  • Category: Uncategorised

CLIENT

Vic Roads

LOCATION

Victoria

COMMENCEMENT

February 2011

COMPLETION

August 2012

TYPE OF CONTRACT

Lump Sum

CONTRACT VALUE

$18.69M (AUD)

PROJECT OVERVIEW

Aldridge Traffic Systems a division of Traffic Technologies was contracted by Vic Roads to replace incandescent and hybrid lantern assemblies and associated works throughout the Metropolitan South East, North West, South West and Western Regions of Victoria.

This included works at some 746 sites initially and through 3 contract variations there was an additional 254 sites completed. As part of the contract variations ATS were contracted to supply and install 140 Traffic Signal Controllers

CHALLENGES

The challenge for ATS was to be able to produce 70,000 traffic signal aspects and have them installed and commissioned on site within a short contract period.

ATS production was ramped up with the addition of a second line to enable us to keep a steady flow of product ready for installation.

ATS employed the services of 5 Vic Roads approved Traffic Signal Installation contractors to carry out the installations which enabled us to meet all contractual obligations (ON TIME ON BUDGET)

PROJECT SPECIFICS

Supply and installation of LED Traffic Signal Lanterns to replace indecent and Hybrid lantern assemblies throughout Victoria.

Supply and install Traffic Signal Controllers

  • 1000 Traffic Signal intersections upgraded to LED
  • 140 new Traffic Signal Controllers supplied and installed
  • Total Project completed on time and within budget

SAFETY

  • LTI’s: Nil
  • MTI’s: Nil